Grid operators must match the level of power being manufactured to desire to stop the grid from overloading, he said. SGIP has a plan price range with a number of techniques, where by the incentive charge decreases as SGIP allocates a lot more funds. As of January 2024 the SGIP https://californiasolarcontractors.art.blog/2025/02/12/diy-vs-california-solar-services-which-one-to-opt-for/