(a) The ACO shall withhold or withdraw acceptance of a contractor’s purchasing system when there are major weaknesses or once the contractor is not able to deliver sufficient data on which to produce an affirmative dedication. Keep track of the status of every invest in order while capturing, categorizing, and https://contractorpurchasingsyste74073.bloggerswise.com/41066009/everything-about-contractor-purchasing-system-review